PORTS / HARBOR DREDGING
PILE DRIVING
GENERAL CONSTRUCTION
BREAKWATER
TUGBOATS / BARGES
CRANES
SHIPBUILDING / SHIP REPAIR
SALVAGE

How to Save:
PC: Right click and choose 'Save Target As'

Mac: Click and hold, choose 'Save Target As'

WHATS NEW

 


sumitomo crane 50 ton, rehabilitation of pier, navotas fish port


Wakanda With Backhoe Lift
 

LIST OF EQUIPMENT

1 Suction dredgers 12 inch dia
2 Grab dredgers 3 to 5 cu.m.
5 Hopper barges 150 to 300 cu.m.
1 Heavy Lift Crane Barge

2 Offshore piling rig 120’
7 Deck barges 200 to 1000 dwt
20 Pontoon barges
6 Tugboats 250 to 1,100 hp
2 Service boats 30 to 200 hp
1 Dozer
1 Wheel loader
1 Grader
2 Vibro compactor/ rollers
2 Crawler cranes 25 to 40 ton
3 Truck mounted cranes 10 to 50 Tons
1 Rough terrain telescopic crane 40 Ton
5 Backhoes 0.5 to 1.5 cu.m.
5 Pile hammers 2.2, 3.2, 3.5, 4.0 Ton
3 Drop hammers 1, 2, 3 Ton
4 Vibro pile drivers, 22kw to 60kw
Concrete mixers
Dump trucks
Trailers
Special support equipment
Compressors
Dredge pumps
Generator sets
Welding machines
Machine shop equipment
Diving equipment
Surveying instruments
Marine slipways


payloader 175-IIIa, construction of slipway no. 3

backhoe, deck barge, slipway no. 3